Follow me step by step as I take you through the process of how I built my dream home with Bellah Homes here in Lee’s Summit, MO!
INITIAL MEETING WITH THE BUILDER,TROY WITH BELLAH HOMES
Once we had determined the floor plan and the finishes that I wanted Troy had the plan redrawn to my specifications. Troy is very detailed in everything he does and that final plan is oh-so important to how the house will be built! This final plan is distributed to all the sub-contractors who will be building my home. This meeting was set up to finalize all changes that I might have prior to digging the foundation.

FRAMING STAGE

PROSOURCE – Picking out my tile flooring, back splash, granite & more!
ROUGH IN CREW, UNDER ROOF & MEETING PAUL




BELLAH HOMES CABINET & ELECTRICAL WALK THROUGH



PICKING OUT GRANITE SLAB FOR KITCHEN



FIREPLACE, HVAC, PLUMBING & FRONT DOOR HAS BEEN ADDED

WEEK 9
TILE ROOF COMPLETE, ALL WINDOWS ARE IN & GARAGE DOORS HAVE BEEN ADDED

PLUMBING & ELECTRIC IS IN

INSULATION HAS GONE IN & WE ARE BEGINNING THE SHEET ROCK STAGE

TRIM WALK-THRU


SHEET ROCK CLEAN UP & EXTERIOR STONE WORK STARTS


PREMIER LIGHTING – PICKING OUT LIGHT FIXTURES


CABINETS HAVE BEEN INSTALLED



HAD A LITTLE SET BACK. SOME OF THE TILE ACCENTS THAT I WANTED GOT DISCONTINUED BY THE MANUFACTURER SO WE MADE A TRIP BACK TO PROSOURCE TO RE-PICK OUT SOME NEW PIECES.
HERE ARE THE NEW PICKS FOR THE MASTER BATHROOM & HALL BATH!

Master Bath Tile Master Bath Tile Accent Hall Bath Shower Accent

Hall Bath Tile, Accent & Granite

TRIM AND CLOSET SHELVING HAVE STARTED TO GO IN. (APRIL 26TH)


STUCCO IS FINISHED ON THE EXTERIOR OF THE HOME & NOW WE ARE WAITING FOR THE WEATHER TO DRY A BIT SO THEY CAN START PAINTING.

CABINETRY HAS BEEN PRIMED & STAINED. ENAMEL ON ISLAND WILL BE GOING ON SOON. GRANITE COUNTERS ARE IN. ALL SHELVING IS IN AND BEING PRIMED FOR PAINT IN CLOSETS. WALLS HAVE BEEN SANDED, PRIMED & HAVE THEIR FIRST COAT OF PAINT ON. MANTEL HAS BEEN ADDED TO THE FIREPLACE.



TILE FLOORING HAS COME IN & IS STARTING TO BE LAID.
DRIVE WAY IS BEING POURED. ENAMEL/GLAZE IS FINISHED ON KITCHEN ISLAND & BUTLER PANTRY. FLOATING SHELVES IN MASTER BATH ARE IN.
DOORS ARE GOING IN & PAINT IS DONE.


DRIVEWAY IS POURED & TILE FLOORING IS DONE


MASTER BATH TILE WORK IS COMPLETED

CARPETING HAS BEEN LAID, LIGHT FIXTURES HAVE GONE IN, KITCHEN HOOD FAN IS GOING IN, GLASS AROUND SHOWER IS GOING IN, FREE STANDING TUB IS BEING PUT IN, COVERED DECK IS DONE, TRIM WORK & PAINTING IS BEING FINISHED UP



STARTING ON UNCOVERED DECK EXTENSION
MEETING WITH THE LANDSCAPER

HOOD FAN IS IN, GARAGE DOORS ARE PAINTED, EXTERIOR AWNINGS ARE BEING STAINED, HALL BATH IS COMPLETE & PANTRY DOOR IS IN!
